Location:
Tordesillas y Velilla (Valladolid)
Commissioning:
December 2019
Scope:
Technology:
Wind
Wind Turbines:
4
Wind Turbines Model:
Siemens Gamesa 114-2.5 MW
Installed Power:
11,69 MW
Transformation Substation:
20/45KV
Location:
Garciahernández (Salamanca)
Commissioning:
February 2010
Scope:
Technology:
Wind
Wind Turbines:
8
Wind Turbines Model:
VESTAS V-90 (2 MW)
Installed Power:
16 MW
Transformation Substation:
20/132 KV
Location:
BP-Cheyper Service Station (Madrid)
Commissioning:
October 2020
Scope:
Technology:
PV Self-consumption
Installed Power:
36 kWp
Location:
BP-La Almunia Service Station (Zaragoza)
Commissioning:
August 2019
Scope:
Technology:
PV Self-consumption
Installed Power:
23.4 kWp
Location:
BP-Olímpica Service Station (Alcorcón)
Commissioning:
June 2018
Scope:
Technology:
PV Self-consumption
Installed Power:
35.64 kWp
Location:
Sorihuela (Salamanca)
Commissioning:
December 2008
Scope:
Technology:
Wind
Wind Turbines:
7
Wind Turbines Model:
Alstom ECO80 - 1670 (1.64 MW)
Installed Power:
11,69 MW
Transformation Substation:
20/132 KV
Location:
Manzanares (Ciudad Real)
Commissioning:
2006
Scope:
Technology:
Photovoltaic
Installed Power:
6 MW
Transformation Substation:
15/45 KV
Location:
Almuradiel (Ciudad Real)
Commissioning:
2008
Scope:
Technology:
Photovoltaic
Installed Power:
3 MW
Transformation Substation:
15/45 KV
Location:
Suellacabras (Soria)
Date:
June 2010/May 2011
Owner:
EON RENOVABLES
Scope:
Technology:
Wind
Wind Turbines:
20
Wind Turbines Model:
General Electric 100-2.5MW
Installed Power:
50 MW
Transformation Substation:
30/66 KV
Location:
Valle de Valdelucio (Burgos)
Date:
April 2010 / June 2011
Owner:
EYRA, S.A.
Scope:
Technology:
Wind
Wind Turbines:
62
Wind Turbines Model:
Alston ECO 80 - 1670 (1.64 MW)
Installed Power:
99,2 MW
Transformation Substation:
20/132 KV
Location:
Pedrosa del Río Urbel y Marmellar de Abajo (Burgos) Spain
Date:
December 2005/November 2006
Owner:
EYRA, S.A.
Scope:
Technology:
Wind
N. Wind Turbines:
33
Wind Turbines Model:
General Electric 1,5 SLE (1,5 MW)
Installed Power:
49,5 MW
Transformation Substation:
20/132 KV
Location:
Pedrosa del Río Urbel and Lodoso (Burgos)
Commissioning:
December 2005/November 2006
Owner:
EYRA, S.A.
Scope:
Technology:
Wind
Wind Turbines:
33
Wind Turbines Model:
General Electric 1,5 SLE (1.500 KW)
Installed Power:
49,5 MW
Transformation Substation:
30/132 KV
Location:
Irixoa, Aranga y Monfero (A Coruña) Spain
Date:
Decembre 2005/July 2006
Owner:
EYRA, S.A.
Scope:
Technology:
Wind
Wind Turbines:
29
Wind Turbines Model:
Gamesa 52 (850 KW)
Installed Power:
24.65 MW
Transformation Substation:
20/132 KV
Location:
Chumillas (Cuenca) Spain
Date:
March 2005/December 2006
Owner:
Urbaenergía – Elecdey CLM
Scope:
Technology:
Wind
Wind Turbines:
25
Wind Turbines Model:
Gamesa 80 (1.800 KW)
Installed Power:
45 MW
Transformation Substation:
20/132 KV
Los Concejiles (11,9 MW)
Ruta de la Plata (25,5 MW)
Los Barranquillos (50 MW)
Los Mesones (50 MW)
Morro del Cuervo (50 MW)
Matabuey (16,2 MW)
El Carpio (3,6 MW)
Épila (5 MW)
Monte Gordo (48 MW)
Sierra de los Alijares (24 MW)
Sierra de Argallen (50 MW)
Sierra del Astorgano (18 MW)
Sierra de Frontocillos (42 MW)
Sierra de Guadamez (12 MW)